
Identity area
Reference code
ID BCO F-1-SF-3-NN.6
Title
Penampang Carteen and Shower House
Level of description
Item
Extent and medium
A3 (skala 1 : 100/ versi digital tersedia)
Context area
Name of creator
(1970 - 1983)
Administrative history
Joint contractors secara resmi mulai bekerja pada tanggal 31 Agustus 1973 setelah penandatanganan kontrak dengan Pemerintah Indonesia melalui Badan Pemugaran Candi Borobudur. Proses lelang pemilihan kontraktor telah dilaksanakan pada tanggal 22 Mei 1973, ... »
Repository
Content and structure area
Scope and content
Penampang Cross Section of The Monument oleh NEDECO (Netherlands Engineering Consultants, the Hague)
System of arrangement
Arranged by location
Conditions of access and use area
Language of material
- English
Finding aid
Allied materials area
Existence and location of originals
I.H
Description control area
Archivist's note
Badan Pemugaran Candi Borobudur (BPCB)
Digital object metadata
Media type
Image
Mime-type
image/jpeg
Filesize
805.8 KiB
Uploaded
November 12, 2019 10:24 PM